Freehold Residential Development Opportunity

HIGH RIDDING, BOLSOVER ROAD, MASTIN MOOR, CHESTERFIELD

 

  • This represents the second phase of the proposed wider Mastin Moor development master plan
  • Outline Planning Permission has been granted for the wider master plan
  • The vendors will undertake the requisite Infrastructure and Enabling works to deliver a serviced residential development plot for this phase

 

Site Overview

Mastin Moor Development Master plan
The site of the wider master plan is located to the south of the village of Mastin Moor. Extending to 46.2 ha (114.16 aces) of mainly agricultural land, Worksop Road (A619) follows its northern boundary and Bolsover Road (B6419) running north to south splitting the site with part of the site extending southwards to Woodthorpe Road. The overall site forms a shallow valley sloping from the ridge lines along Worksop Road and Woodthorpe Road towards a watercourse that runs in a westerly direction through the site. Mastin Moor lies adjacent to the well regarded village of Woodthorpe, and Markham Vale, one of the regions flagship regeneration schemes consisting of a 200 acres business park employing over 2,500 people.
 
High Ridding
High Ridding extends to 4.55 ha (11.24acres). Whilst situated to the east of the village, High Ridding will be accessed from a newly constructed Spine Road leading from Bolsover Road serving both this phase and the initial phase of development at Low Ridding. A planning application for an initial phase of 143 units is currently under consideration by Chesterfield Borough Council (TP ref: CHE/23/00370/REM).

Mastin Moor is located approximately 8km east of Chesterfield and 12 km west of Worksop. Extensive services and facilities can be found in neighbouring Staveley and the village is well linked to Chesterfield and beyond by a regular bus service. Junction 30 of the M1 is 2km north east of the subject site at Barlborough.
 

Town Planning

The land is Allocated as a Housing Site in the adopted Chesterfield Borough Council Local Plan (Housing Site ref H35) – adopted July 2020.

Outline Planning Consent for residential development of up to 650 dwellings (TP Ref: CHE/ 17/00469/OUT), including elderly care and specialist accommodation, a local centre (including local retail, health facilities, other local facilities and services), open space, community garden extension (including community building and parking) and associated infrastructure was originally granted on Appeal on 13th October 2020.

An amended Outline Planning Permission (TP Ref: CHE/20/00700/OUT) incorporating an amended master plan was granted February 2023, delivering a consent for up to 650 dwellings, a residential care facility with extra care, a Local Centre (including local retail, health facilities, leisure facilities, other local facilities and services, offices), open space, community garden extension, community building, parking and associated infrastructure and earthworks. The Sec. 106 Agreement accompanying this planning permission requires 5% of all dwellings as affordable. The Sec. 106 Agreement requires other financial contributions, but these will be the responsibility of our clients, Devonshire Property (MM) Limited. The site falls within the lower charging rate for CIL, meaning new residential development will attract CIL of £20/ sq. m, and this will be the responsibility of the purchasers.

All information relating to CHE/20/00700/OUT can be found in the ‘Documents and Downloads’ section ion the ‘Planning’ folder. Should interested require any information relating to CHE/17/00469/OUT please contact one of the joint selling agents, or visit Chesterfield Borough Council’s Planning Portal.

Please note the approved master plan provides for phase 1 & 2 to deliver 315 units. Assuming the current Reserved Matters planning application is approved for phase 1, High Ridding can deliver a further 172 units.
 

INFRASTRUCTURE AND ENABLING WORKS

Devonshire Property (MM) Ltd have submitted a Reserved Matters planning application (TP ref: CHE/23/001EM) for a series of enabling works. These include:

  • Bulk Earthworks in accordance with the ‘Levels Plan’
  • S278 – Access from Bolsover Road in accordance with the ‘Infrastructure Plan’ and ‘Low Ridding Access Plan’
  • S38 – central spine road access known as The Avenue in accordance with the ‘Infrastructure Plan’
  • S104 – SUDS ponds and Foul Water Pump station, to provide unrestricted sewer connection in accordance with the ‘Surface Water Drainage Plan’ and ‘Foul Water Drainage Plan’
  • Utility connections including gas, water, electric and telecoms/ media in accordance with the ‘Electric’, ‘Water’ and ‘Gas’ Layout Plans

It is anticipated the planning application will be approved in August 2023, with works schedules to commence immediately following planning approval and completed early 2024. All information relating to the above is available in the ‘Documents and Downloads’ area in the ‘Utilities Design’ and ‘Earthworks Specification’ folders.

To be clear, the land is offered For Sale on a ‘serviced basis’, with the infrastructure works approved under CHE/23/001EM being undertaken by our clients to deliver a serviced development parcel. Levels, service connection points, drainage and access will be delivered to the specification outlined in the Engineering and Technical information available in the ‘Documents and Downloads’ section.
 

FURTHER INFORMATION

In addition to the information referred to in the Town Planning section above a full suite of planning and technical information is available in the ‘Documents and Downloads’ section including:

  • Topographical Survey
  • Site investigation reports
  • Landscape master plans
  • Archaeology Reports

CONSTRUCTION SKILLS HUB

A Construction Skills Hub is to be provided as part of the development. The Construction Skills Hub is an on-site construction training centre that will develop a pipeline of skilled workers, creating employment opportunities for the local area. Its location is shown on plans in the ‘Construction Skills Hub’ folder in the ‘Documents and Downloads’ section. The Construction Skills Hub will be provided for the life of the wider development. Our clients will require a commitment from the Purchaser to utilise the Construction Skills Hub for Trainees and Apprentices.
 

MANAGEMENT COMPANY

The vendors have appointed a Management Company to maintain the site wide open spaces and link with the local community. Further information is available on request.
 

INCLUSION

Our clients are committed to improve diversity in the Construction industry, and as such please include an explanation as to how your Company is committed to increase levels of diversity and inclusion across the industry.
 

TENDER PROCESS

Offers are invited on either a conditional or unconditional basis for Low Ridding. Offers are to be submitted in writing by 12 noon on Friday 6th October. All offers should be accompanied by bidders proposed layouts and completed Bid proforma (provided on request by the selling agents), and copied to both agents.
 

VIEWINGS

The site can be viewed from both Worksop Road and Bolsover Road. Should interested parties wish to walk the site, please contact either of the selling agents.
 

Contact

For further information, please contact:

Matthew Bagley
Titchmarsh & Bagley
Tel: 07912 952502
matthew@titchmarshandbagley.com
     Rob Wilkins
Wilkins Hammond
Tel: 07971 250180
rgw@wilkins-hammond.com